Home / Blog / Process
Process

What our video sprint actually includes

15 Oct 2026 · 5 min read · MANDEN
What a MANDEN video sprint includes — first cut in 10-24 hours, by project

Key takeaways

“Fast delivery” is a promise every studio makes. Few define it. Here is exactly what happens inside our video sprint, so you know what you are buying before you send the first file. A first cut comes back in 10–24 hours, by project size — creator shortlists are even faster.

Hour 0–2: Intake lock

You send raw footage via Google Drive, brand assets, and one line of goal per video. We confirm the scope back to you in writing: what gets cut, how many versions, delivery date. No moving goalposts after this point.

Hour 2–10: Structure pass

Before any editing: hooks are chosen, scene order is locked, sound direction is set. This is where 80% of quality is decided. If a clip cannot be saved, we tell you in this window — not after you have waited two days.

Hour 10–18: The cut

Pacing, overlays, colour, sound layers, captions. You do not hear from us in this window. That is the point. Work, not updates.

Hour 18–22: First delivery

You get the first cut with a fixed revision format: one consolidated feedback round, from one decision-maker, with timecode references. This is why revisions stay fast and final.

Hour 22–24: Final

Revisions applied, masters rendered, all versions delivered: platform ratios, thumbnails where needed, a delivery note listing every file. For long-form work the first cut comes back within 18–24 hours; the rest of the review cycle is open for the two you truly need.

What it does not include

The sprint is the product. It is why brands stop chasing editors and start shipping launches.

Timelines set per service, not per studio.
Get a scope in 24 hours on WhatsApp →

Frequently asked questions

Is 10–24 hours enough for a good edit?

For reels, ad cut-downs and short product films, yes — the structure pass is done before the timeline opens. Long-form pieces need a longer scope and we talk numbers upfront.

What if I need changes after the first cut?

One consolidated feedback round is included with timecode references. Extra rounds beyond that are quoted as a small top-up rather than billed as a surprise.

video editing sprint10-24 hour editfirst cut timelinecreator campaigns timeline
← All notesGet a free audit →
Read next
ProcessHow to write a video brief an editor can actually useProcessHow to choose a video editing agency: nine questions that matter